Skip to content
  • Tel: 0243.664.8242
  • Tel: 0243.664.8242
SUNWON CablesSUNWON Cables
  • About us
    • Vision, mission
    • Business philosophy
    • Core Values
    • Productive capacity
    • Quality Certification
  • Products
    • Twisted Electrical Cable
    • Household Electrical Wire
    • Low Voltage Cable
    • Medium Voltage Cable
    • Bare Electrical Cable
  • Catalogue
  • Quote
  • Dis. System
  • Project
  • News
  • Contact us
Bảng-1---Các-dữ-liệu-chung-đối-với-kiểu-6610-TCVN-01-(227-IEC-01)
TCVN 6610-3: 2000 (IEC 227-3)

STANDARD VIETNAM NAM TCVN 6610-3 : 2000 IEC 227-3 : 1993 WITH AMENDMENT 1: 1997 [...]

vinadic-tro-thanh-nha-thau-co-dien-du-an-the-nine-1
VINADIC becomes the M&E contractor of The Nine project

After a rigorous bidding and selection process of The Nine project investor (GP INVEST Group), [...]

Vấn-đề-‘sử-dụng-triệt-để’-và-‘hiệu-quả’-năng-lượng-tái-tạo-Việt-Nam
The issue of ‘thorough use’ and ‘effectiveness’ of Vietnam’s renewable energy

I. Pros and cons of Vietnam’s rapid development of renewable energy sources The total capacity [...]

Thanh-Hóa-Khơi-dậy-tiềm-năng-phát-triển-nguồn-năng-lượng-sạch
Thanh Hoa: Arousing the potential of developing clean energy sources

There are many ways to put clean energy into use, in which the installation of [...]

evn-rut-ngan-lo-trinh-hoan-thanh-chuyen-doi-so-vao-2022
In which areas does EVN plan to digitally transform?

Reporting at the meeting, Head of Telecommunications & Information Technology (VT&IT) Department of the Corporation [...]

Nắng-nóng-khiến-lượng-điện-tiêu-thụ-tăng-cao
Hot weather causes electricity consumption to increase

Electricity consumption across the city on June 3 was 78,171 million kWh; June 4-6 is [...]

chọn-điều-hòa-cũ
Tips to choose to buy used air conditioners, both good and durable to avoid “throwing money out the window”

The following are some tips for choosing to buy an old air conditioner that will [...]

anh-cac-dai-bieu-an-nut-phat-lenh-khoi-dong-dien-gio-hoa-binh-5-giai-doan-1-16024095935291242424066
Commencement of construction of the largest wind power plant on land

On October 11, in Vinh Thinh commune, Hoa Binh district, Bac Lieu province, the construction [...]

EVNSPC: Expanding cashless payment

In 21 southern provinces, the program to stop collecting electricity bills at customers’ homes and [...]

EVN will provide maximum support for rooftop solar power investors

EVN General Director – Tran Dinh Nhan emphasized, it is necessary to focus on removing [...]

dien_mat_troi
Promoting the development of rooftop solar power in the Southwest region

It is estimated that for every 1m2 installed solar panels can collect 5 kWh of [...]

SUNWON ủng hộ quỹ phòng chống Covid
SUNWON Electric Cable Company supports covid prevention fund

In the first half of 2021, Vietnam faces the two largest outbreaks of disease ever [...]

  • 1
  • 2
  • 3
  • 4
News
  • Quotation for power cable 2×10
  • Quotation for power cable 4x16mm2
  • Quotation for 4×2.5 electric wire
  • Quotation for 2×4 electric wire
  • Quotation for 0.75 electric wire
  • Quotation for 2×0.75 electric wire
  • Quotation for 3 phase aluminum core power cable
  • What is CXV power cable?
  • Quotation for electric cable 240mm2
  • Standard low voltage underground cable
  • Medium voltage underground cable standard
  • Quotation for 4 core wire
  • Conductor cross-sectional lookup table according to industry standards
  • Quotation for 1 core wire
  • Quotation for 1.5 electric wire
  • Quotation for electric wire 2×2.5
  • Quotation for 2×6 electrical wire
  • Quotation for 2×1.5 electrical wire
  • Quotation for 2.5mm2 m electrical wire
  • Price list of electric wire 4.0
  • Compare power wires and cables
  • Quotation for 3 phase power cable
  • Distinguishing 3 phase vs 1 phase electricity
  • Insulation standards of electric cables
  • What is XLPE Insulation?
  • Learn about high voltage, medium voltage, low voltage
  • What is DSTA?
  • How to read parameters on power cables
  • Learn about Electric Wires and cables
  • TCVN 5934: 1995
Contact us

Area 1: Mr. Thuc: 08.888.533.70 (zalo)

Area 2: Mr. Duy: 08.888.533.69 (zal0)

Area 3: Mr. Tu: 08.888.533.74 (zalo)

Area 4: Mr. Thuyen: 08.888.533.71 (zalo)

Area 5: Mr. Quan: 08.888.533.76 (zalo)

Area 6: Mr. Que Anh: 08.888.533.73 (zalo)


For Project: Mr. Hung: 0911.142.326 (zalo)

For Building: Mr. Van: 0395.339.229 (zalo)

Or Let us contact you





    logo 2-1

    Korea Electrical Equipment Joint Stock Company

    • Add: No. 9, TT1A, Southwest residential area Linh Dam, Hoang Mai, Hanoi;
    • Tel: 0243.664.8242
    • Fax: 0243.664.8242
    • Hotline/ Suggestion: 0912.460.663

    Factory

    Fac. 1

    D9, Dinh Tram Industrial Park, Hoang Ninh Commune, Viet Yen District, Bac Giang Province

    See map

    Fac. 2

    D2 road, Yen My II Industrial Park, Yen My town, Yen My district, Hung Yen province

    See map

    Company policy
    • Payment policy
    • Privacy Policy
    • Shipping Policy
    • Terms & Conditions
    Quick access

    About us
    Products
    Catalogue
    Quote
    Project
    Distribution system
    Contact us

    Fanpage

    Copyright 2025 © Korea Electrical Equipment Joint Stock Company- D2 Street, Yen My II Industrial Park - Yen My Town - Yen My District - Hung Yen.
    Representative: Ms. Nguyen Thi Hoang Duyen.
    Tax code: 0101816468 issued at the business registration office of the Department of Planning and Investment of Hung Yen province.
    DMCA.com Protection Status
    • About us
      • Vision, mission
      • Business philosophy
      • Core Values
      • Productive capacity
      • Quality Certification
    • Products
      • Twisted Electrical Cable
      • Household Electrical Wire
      • Low Voltage Cable
      • Medium Voltage Cable
      • Bare Electrical Cable
    • Catalogue
    • Quote
    • Dis. System
    • Project
    • News
    • Contact us

    Login

    Lost your password?